Every hot mop pan we build is water-tested before it's covered, so you, your contractor and the inspector know it holds water before tile goes on.
Get a free estimate (949) 446-4413
The short answer
A flood test proves a shower pan is watertight before it's buried under mortar and tile. The drain is plugged, the pan is filled with water to just below the top of the curb, the water line is marked, and the water is left to stand. If the level holds and nothing shows up below or beside the shower, the pan passes.
The test happens on the bare membrane, before the mortar bed and tile. That's the whole point: if anything needs attention, it's found and fixed while it's still easy to reach.
Many building departments want to see the shower pan, often with water in it, before it's covered. Requirements vary from city to city in Orange County, so confirm the details with your building department or your contractor. What we do on our side:
A passing flood test tells you the pan held water when it was tested. It doesn't cover what happens later: a drain whose weep holes get blocked, damaged grout, a leaking valve or supply line, or water escaping past a shower door. Those are separate parts of the shower, and they're worth knowing about. Our guide to signs your shower pan is leaking explains how to tell them apart.
A true pan flood test is done on the bare membrane. On a finished shower, water poured onto the tile soaks into the grout and mortar bed, so the result is harder to read. If you suspect an existing shower is leaking, call us: we'll talk through what you're seeing and the sensible next step. See shower pan leak repair.
We flood test every hot mop pan we build, from Irvine and Tustin to Dana Point, San Clemente and Laguna Niguel. See areas we serve.
The water is left to stand for the time the job or the inspector calls for, often about a day. We'll tell you the plan for your shower with your estimate.
How deep is the water in a flood test?The pan is filled to a level just below the top of the curb, so the whole floor of the pan, including the corners and the base of the walls, is under water.
What happens if a pan fails the flood test?We find the problem and fix it, then test again. That's exactly why the test happens before the mortar bed and tile go in.
Does the inspector need to see the water?Often, yes. Many building departments inspect the pan with water in it before tile. Check with your city or contractor, and we'll have the pan ready.
Homeowner, contractor or tile setter: call or send the details and we'll get back to you. Mon–Sat, 8:00–5:00.